Global Food and Ingredients (GFI) has a large manufacturing facility in Zealandia, Saskatchewan. In 2022 they completed a pea-splitting addition to the facility, capable of processing 60,000 tonnes of peas per year.
This facility was acquired in 2019 from Canpulse, along with other Canpulse facilities in Lajord and Sedley, Saskatchewan.
In 1999 Zealandia still had three wooden grain elevators.
Back to Saskatchewan grain elevators