Huxley

GrainsConnect elevator outside Huxley, AB, July 2021. Contributed by Jeff Whyte.
GrainsConnect elevator outside Huxley, AB, July 2021. Contributed by Jeff Whyte.

A new grain terminal was built outside Huxley, Alberta recently, and opened in September 2019. This concrete silo structure can load over 130 rail cars in 14 hours. It is owned by GrainsConnect.

Back to Alberta grain elevators